Includes:

  • Motors by Buyer
  • Qty. 2 Gear Reducers
  • Drive Shafts
  • Distribution Gearbox
  • Qty. 3 Adjustable Flights of Back-up Rolls

Summary of Rebuild
The 9 Roll Leveler will be completely disassembled, inspected, cleaned, painted, and reassembled.
All Work Roll Bearings and Back-up Roll Bearings were removed, cleaned, inspected, and new ones were installed.

The 4-35 Ton top screw jack and the 3 bottom screw jacks were taken apart, cleaned and inspected. During the reassembly, the screw jacks were resealed and packed with grease. The motors and gearboxes were cleaned, inspected, and repainted.