Includes:
- Motors by Buyer
- Qty. 2 Gear Reducers
- Drive Shafts
- Distribution Gearbox
- Qty. 3 Adjustable Flights of Back-up Rolls
Summary of Rebuild
The 9 Roll Leveler will be completely disassembled, inspected, cleaned, painted, and reassembled.
All Work Roll Bearings and Back-up Roll Bearings were removed, cleaned, inspected, and new ones were installed.
The 4-35 Ton top screw jack and the 3 bottom screw jacks were taken apart, cleaned and inspected. During the reassembly, the screw jacks were resealed and packed with grease. The motors and gearboxes were cleaned, inspected, and repainted.